Homes of varied tenures
There would be 818 new homes, with a mixture of one, two, three and four-bedroom apartments.
The proposals will provide 818 new homes, including affordable homes, with a mixture of one, two, three and four-bedroom apartments.
There would be 818 new homes, with a mixture of one, two, three and four-bedroom apartments.
Twenty-three per cent of the new homes would be affordable, comprising shared-ownership and social-rent homes.
The homes have been designed to meet Nationally Described Space Standards and the relevant Greater London Authority space and amenity standards.
The illustration shows the location, proposed tenure and maximum height of each building. Select a marker to identify the block and its height.
Private
Affordable rent
Private and shared ownership
Commercial
Concierge
Leisure: gym and games
The number beside each block letter shows its maximum storey height.
The proposals follow the London Plan energy hierarchy, reducing demand before introducing lower-carbon and renewable-energy technology.
Passive-design and energy-efficiency measures would achieve savings of 10% for domestic buildings and 15% for non-domestic buildings over Building Regulations requirements.
There are currently no existing or proposed district heat networks in the vicinity of the site.
Air-source heat pumps and solar photovoltaic panels on suitable roofs would provide lower-carbon energy.
These measures are expected to deliver further carbon savings, with the aim of achieving an overall 35% on-site reduction against Part L 2021.
Commitments would be made to monitor and report on energy consumption once the development is in use.
We are aware that new homes place additional pressure on local infrastructure. A significant cash contribution will be paid to the London Borough of Hillingdon and the mayor of London to allow additional infrastructure investment. This could take the form of additional money for school buildings, new public transport facilities - it will be for Hillingdon and the Mayor of London's team to decide how the money is spent.